Connecting Workflows: RFI to Potential Change Order

May 11, 2020 Tomer Rosenthal

RFI to Potential Change Order

Create a Potential Change Order (PCO) from an RFI or link existing RFIs to PCOs from the RFI record in Project Management. 

Permission Level:

  • Only Project Management Admins and RFI Managers with a Cost Management license and full budget permission control have access/visibility to this feature. 

Creating a PCO from an RFI

  • Open the RFI record.
  • Within the details tab, scroll to Linked References and select “Add reference.”
  • A add link to PCOs box will appear, select “Create new.”
  • In the form, fill in the PCO name and description, then select “Create PCO.” This information will copy over from the RFI to the PCO, but it can be altered directly in the PCO record.
  • Once the PCO is created, a bi-directional relationship between the RFI and PCO is established.
  • All activity is captured in the RFI and PCO activity logs.

Linking RFIs to PCOs

  • To link RFIs to PCOs follow the same steps as above. However, when the add link to PCOs box appears, simply select the PCO(s) from the list and click “Add.”
  • To unlink a PCO select the “X” and “Unlink.”
  • Once linked a bi-directional relationship between the RFI and PCO is established.
  • All activity is captured in the RFI and PCO activity logs.

Accessing Linked PCOs 

  • Only Admins & RFI Managers can view/access linked PCOs in Project Management.
    • RFI list view – In the linked references column, select the PCO number to open the PCO in the Cost Management module.
    • RFI Record – In the RFI record select the PCO number in the Linked References section to open the PCO in the Cost Management module.

Accessing Linked RFIs

  • In the Cost Management Module, select the PCO to open the details flout panel.
  • In the details flout panel in the Linked Entity section select the RFI number to be directed to the RFI in the Project Management module.

Read more...

Previous Article
BIM 360 Model Coordination – May 2020 Release Notes
BIM 360 Model Coordination – May 2020 Release Notes

The May 2020 Model Coordination update greatly improves the efficiency of coordination. Direct mapping to P...

Next Article
BIM 360 Docs – March 2020 Release Notes
BIM 360 Docs – March 2020 Release Notes

The March 2020 BIM 360 Docs update includes the highly-requested ability to share files and folders with pr...