Case Study: Using BIM 360 on an Industrial Construction Project

October 10, 2019 Cody Austin

 

In this case study (video above, slides below), learn how KBR used BIM 360, Navisworks, and iConstruct software to facilitate their Advanced Work Packaging process and increased project visibility, construction productivity, quality, and safety on a $500 million industrial construction project on the Texas Gulf Coast.

 

 